Schedule I – List of Tentative Small Hydro Projects (These details are indicative. Capacity & Location of a particular SHP may change as per assessment of Developer subject to approval of UPJVNL)
S No.
|
Name of Project
|
Capacity(M.W)
|
Distt
|
Canal
|
1
|
Khairi
|
3.75
|
Saharanpur
|
Hathini Kund Link Canal
|
2
|
Madho-I
|
3.75
|
Pilibhit
|
Sharda Canal Hardoi Branch
|
3
|
Madho-II
|
2.50
|
Shahjahanpur
|
Sharda Canal Hardoi Branch
|
4
|
Shahjahanpur(Nahil)
|
2.50
|
Shahjahanpur
|
Sharda Canal Hardoi Branch
|
5
|
Ram Ganga
|
3.20
|
Bijnore
|
Ram Ganga Feeder Canal
|
6
|
Bansagar-I
|
12.00
|
Mirzapur
|
Adwa Meja Link Canal
|
7
|
Bansagar-II
|
10.00
|
Mirzapur
|
Adwa Meja Link Canal
|
8
|
Ken Branch-I
|
3.00
|
Banda
|
Ken Branch
|
9
|
Ken Branch-II
|
1.50
|
Banda
|
Ken Branch
|
10
|
Bandran
|
10.50
|
Lalitpur
|
Dam toe
|
11
|
Karmnasa
|
2.00
|
Chanduli
|
Dam toe
|
12
|
Sharda Sagar
|
3.00
|
Pilibhit
|
Dam toe
|
13
|
Dunda
|
5.00
|
Pilibhit
|
Sharda Canal Hardoi branch
|
14
|
Malakpur Rehni
|
4.00
|
Saharanpur
|
Eastern Yamuna Canal
|
15
|
Meja
|
9.50
|
Mirzapur
|
Dam toe
|
Total
|
76.20 M.W.
|
Note:-
1- As per latest Energy Policy of UP Govt., all the above identified new projects are to be developed in Private Sector.
2-Existing and more than 70 years old Nirgajini (5MW), Chittaura (3MW), Salawa (3MW) and Bhola (2.7MW) SHP Stations on Upper
Ganga Canal are to be closed down Gradually and in the mean while new SHP station with higher capacity are to be set up at location near by to the
existing SHP. These four new SHP station on UGC has been decided by UP Govt. to be set up in Private Sector as a part of UGC Expressway Project.